    If Park Avenue () construction was an annoyance, this one is going to be a TON of fun with the start of the school year and all Fall...those West drop-offs going to be SO MUCH FUN!

    The Taylor Avenue Underpass will be closed beginning Monday, August 13. Take note that the Underpass will be closed to both pedestrian and vehicular traffic throughout the duration.

    "Construction of the Taylor Avenue Pedestrian Tunnel project, located approximately a half mile east of downtown Glen Ellyn’s Central Business District, is anticipated to begin in late August. The project, located on the east side of Taylor Avenue at the existing underpass of the Union Pacific Railroad West Line, will create a grade-separated pedestrian crossing of the railroad for safer and enhanced bicycle and pedestrian accommodation. Additionally, it will improve vehicular maneuverability through the existing underpass by removing the sidewalk and maximizing the roadway width. This element is particularly relevant for access of public safety vehicles.
    Construction is expected to take approximately four months and is anticipated to be complete by then end of 2018. As a result, full closure of the existing tunnel will be required through the duration of the project with detour routes posted to route traffic around the work site."

  2. #2
    Forum All Star DTM's Avatar
    Join Date
    Nov 2011
    Location
    Mile High
    Posts
    2,951
    gee, you think it would have made more sense to do this over the summer.....

  3. #3
    Won't the noise disrupt classes at GW?

  4. #4
    Forum Hall of Famer Cliché's Avatar
    Join Date
    Dec 2011
    Posts
    4,483
    Quote Originally Posted by Curly View Post
    Won't the noise disrupt classes at GW?
    No, the 150 plus trains a day will drown out that noise.

  5. #5
    Forum All Star middlein87's Avatar
    Join Date
    Nov 2011
    Location
    Posh YMCA District
    Posts
    2,079
    Quote Originally Posted by DTM View Post
    gee, you think it would have made more sense to do this over the summer.....
    Railroads don't give a **** about anybody else's schedule. I've no inside knowledge on this project, but I'll give 5-1 odds on the railroad being the main reason this is happening at a stupid time of year.

  6. #6
    I find the parking lot renovation at Ackerman to be a lot bigger pain in the @$$. This town sucks.

  7. #7
    Forum Regular mamattorney's Avatar
    Join Date
    Nov 2011
    Posts
    446
    silver lining - my kid's walk to GBW was bumped over 1.5 miles due to a closed underpass. So, for as long as it's closed, she could take the bus (though she said she'd rather walk)

  8. #8
    Forum Hall of Famer Cliché's Avatar
    Join Date
    Dec 2011
    Posts
    4,483
    Quote Originally Posted by mamattorney View Post
    silver lining - my kid's walk to GBW was bumped over 1.5 miles due to a closed underpass. So, for as long as it's closed, she could take the bus (though she said she'd rather walk)
    Great kid. I know a Clichétte in my home who will work really hard every 5th day to be ready by 6:45 so I can drive said Clichétte up the hill rather than drop curbside.

  9. #9
    Forum Hall of Famer Cliché's Avatar
    Join Date
    Dec 2011
    Posts
    4,483
    Quote Originally Posted by Bitter Boy View Post
    I find the parking lot renovation at Ackerman to be a lot bigger pain in the @$$. This town sucks.